Project Summary:
Originally built in 1889 and later relocated onto a rubble foundation, this home was a true diamond in the rough. Mid-century updates had stripped the charm and buried it in wall-to-wall carpeting (yes, even in the kitchen and bathrooms). The brick planters in the kitchen sealed the deal: the new homeowners knew it was time to call in help.
Project Renderings
Project Details
Vision:
Breathe new life into the home while honoring its roots. The plan included reconfiguring the basement staircase to open up the kitchen, updating plumbing, electrical, and hot water heat, adding new windows and flooring, and tackling asbestos removal. One of the most significant upgrades was custom millwork that restored a sense of period-appropriate detail. Powerful 3D rendering was used to communicate the changes so the homeowners could see exactly where we were going.
Design Concept:
Preserving the few original details that remained and thoughtfully reintroduced period-appropriate character made the home feel timeless, elevated, and livable for today. The main floor underwent a full transformation. The basement staircase was relocated to open up the kitchen layout, which was gutted and expanded. Kitchen and dining room ceilings were raised to remove the awkward drop that occurred during a previous remodel. Asbestos abatement occurred in all affected areas. To support the second floor, we had to remove a curved archway in the living room and installed a structural beam to trade dated ornamentation for integrity and long-term stability. New flooring was installed throughout the main level to create a cohesive and refreshed foundation for the updated design.
Unique Design Elements:
The most unique 'surprise' we encountered was the entire main floor was made of hand hewn logs. We were able to keep one wall in the dining room intact including the pencil marks that indicated the location and position for reinstallation when the structure was moved to it's current location. We brought in traditional craftsman millwork to replace what had been removed during the earlier remodel. 8’ doors were used to bridge the gap to the new almost 10' ceiling height. A larger front window that opened brought functionality and balance to the front facade. The stair railings brought back traditional elements in keeping with the home's past.
Construction Challenges:
This project was not for the faint of heart. From day one, the construction team faced surprises hiding behind nearly every wall and ceiling. Once we opened things up, we discovered NO insulation on the main floor where old doorways had been covered up and original knob-and-tube wiring still in place in a few areas. The biggest twist? The entire main floor structure was hand-hewn log and while beautiful, but not even close to level or plumb. Every inch of the build required adaptation, precision, and creative problem-solving. What worked in 1889 doesn’t exactly align with modern building codes or tools. Today’s laser levels and framing nailers were squaring up against 19th-century craftsmanship done with a broad axe and chisel. It was equal parts puzzle and preservation and a huge testament to the talent and flexibility of the build team and patience of the homeowners.
Design Changes:
An upstairs bathroom remodel was added to the project. By reworking the kitchen layout on the main floor, we were able to create the access needed to run new plumbing and electrical to the second floor and attic spaces. The existing upstairs bathroom was completely gutted and reimagined with a more functional layout that now includes a double vanity, a bidet toilet, and a tub/shower combo. Though compact, the space is highly efficient and tailored to the homeowners’ needs and proof that good design doesn’t have to be big to make an impact. The additional kitchen window above the sink shown in the renderings was omitted from the project and the original openings to the dining room were kept to retain flow.